Primary Mobile Navigation

  • Projects
    • Furniture
    • Custom Work
  • Journal
  • About
  • instagram
  • facebook
2020 © Composite Angle Design Inc.
KNJensen
  • Projects
    • Furniture
    • Custom Work
  • Journal
  • About
  • instagram
  • facebook
2020 © Composite Angle Design Inc.
insulation-in
insulation-in
drywall-started

drywall-mudded
kitchen-assembled
drywall

first-ever-plumbing-joint
kitchen-in-place

13
Dec 2011

The Drywalling and Kitchen Assembly


0 likes

Related posts:

  1. Taking down the apartment: Part 2
  2. Water and Sewer
  3. Kitchen and Bathroom Update
  4. Barn Bathroom Tiling
Filed under: The Barn updates
Share:

Leave a comment


Cancel reply